Application-led production guidance for preserves, sauces, chutneys & picklesCall an engineer  01494 623015sales@lancinguk.com
Capacity planning tool

Convert weekly demand into a practical planning rate.

Enter saleable weekly demand, scheduled production time and headroom. Then test the result against filling, closing, cleaning, changeover, replenishment and operator constraints.

Automatic multi-head sauce filling line
Average and headroom rateBrief output-band indicationLine-loss warning included
Demand inputs

Planning calculator

Use saleable packs, not gross filler cycles. Add headroom for normal variation, then model downtime separately.

This increases the average required rate but does not replace a downtime or OEE study.
Capacity method

Build from saleable demand backwards

01

Set weekly demand

Use forecast saleable packs and include product/pack variants.

02

Define real production time

Remove breaks, cleaning, warm-up, changeovers and maintenance from theoretical hours where appropriate.

03

Add sensible headroom

Allow growth and normal variation without quoting an unrealistic maximum cycle.

04

Balance every stage

Compare filler, capper/sealer, labeller, coder, inspection and case-packing constraints.

05

Prove sustained output

Run representative materials long enough to include replenishment and normal micro-stops.

Important: an integrated line normally needs a detailed capacity model. The calculator is a transparent first pass, not an output guarantee.
Starting bands from the brief

Use weekly bands to shortlist automation level.

These bands frame an initial conversation; they do not prove that a particular machine will achieve the calculated rate.

Fewer than 500/weekDesktop / bench

Manual presentation and semi-automatic filling or closing.

Flexible low-volume route
500–2,000/weekCompact cell

Compact machinery with selected assisted stages.

Structured operator cell
2,000–10,000/weekTwo-head line

Coordinated conveyor filling and downstream operations.

Integrated production
10,000+/weekMulti-head line

Automatic handling and balanced downstream equipment.

Higher sustained demand
Loss model

Account for the time the line is not making accepted packs.

A machine's individual cycle rate is only one part of weekly capacity.

Loss categoryExamplesPlanning response
Planned non-runningWarm-up, clean-down, format change and scheduled checks.Deduct time or schedule separate production blocks.
MaterialsProduct refill, jar loading, closure refill, label-roll and film change.Model frequency, duration and operator responsibility.
Micro-stopsMissed pack, cap feed interruption, label fault or sensor recovery.Use representative sustained trials and buffer design.
Quality lossStart-up waste, rejects, under/overfill and seal faults.Calculate on accepted packs and improve root causes.
StaffingCompeting tasks, breaks, case packing and material movement.Create an operator work-content study.
Product variationCold batch, higher viscosity, more pieces or foaming.Qualify the worst credible operating condition.

Turn your product and pack into a testable production route.

Share representative product, containers, closures, labels and your required output. Define the operating window and agree what a successful trial must demonstrate.

CallStart a project